The situation
The school’s two servers are getting old. One holds shared folders that staff use every day; the other runs an administration application from an outside vendor. Email already runs in Microsoft 365. The school wants fewer machines to look after, but it cannot afford a disrupted school day, and nobody is sure which files and applications depend on each other.
This is the kind of request a free baseline review is for: a conversation, a remote look at the relevant environment with access agreed first, and written recommendations. Nothing below is a fixed plan, price or timeline.
A proposed flow
Who does what, step by step. Decision points stay with named people at the school.
- Your team
- Smart Tasq
- Decision point
- Together
Your team
Describe what runs today
List the servers, the folders and applications on them, who uses them, and dates when nothing may change.
Smart Tasq
Review the environment remotely
With access agreed first, look at the servers, user accounts, backups and how the application connects to its data.
Decision point
Choose an approach for each workload
For each item: move it to Azure largely as it is, replace it with Microsoft 365 (for example, shared folders in SharePoint or OneDrive), or leave it where it is for now.
Smart Tasq
Prepare the target and test it
Set up identity, access, networking and backup in Azure, check the application’s dependencies and compatibility, then test with a small pilot group before anyone else moves.
Decision point
Approve the change window and the way back
Agree when the move happens, what “working” means, and what would trigger a return to the old setup.
Together
Move, check and keep the old copy
Move in the agreed window, check with the pilot group, and keep the old servers read-only until the school agrees to retire them.
Smart Tasq
Look after the new environment, if agreed
Ongoing management of the Azure environment and Microsoft 365 is a separate decision, scoped after the move.
Decisions that stay with people
- Which workloads move, which are replaced and which stay for now.
- The change window, and the conditions for rolling back.
- Who approves administrative access, and for how long.
- When the old servers are switched off and how their data is retained.
- The Azure subscription owner and the budget for running costs.
Scope boundaries
Within this scenario
- Remote Azure setup, management, changes and infrastructure moves.
- Microsoft 365 configuration such as moving shared folders.
- Helpdesk support for staff during the change, if included in scope.
- Replacement hardware sourced through Ingram, if new devices are needed.
Not assumed or not offered here
- On-site work: on-site coverage has not been confirmed.
- A fixed timeline, guaranteed uptime or zero-downtime promise.
- License or Azure running-cost figures (these depend on choices made in the review).
- Support for the vendor’s own application beyond moving and connecting it.
- Any compliance certification of the new environment.
Tradeoffs to weigh
| Option | What it offers | What to weigh |
|---|---|---|
| Move servers to Azure largely as they are | Fewest changes for staff. The intended benefit is that the application keeps working as it does now, which depends on the vendor supporting it in Azure, dependency and compatibility checks, and successful testing. | Not guaranteed until tested; running costs continue; old designs move with it; still a server to manage. |
| Replace shared folders with SharePoint or OneDrive | No file server to maintain; sharing and access managed in Microsoft 365. | Folder structure and permissions need cleaning up first; staff need guidance. |
| Leave a workload on-premises for now | No migration work this term; time to plan properly. | The hardware keeps aging; two environments to look after. |
What to discuss in a free baseline review
Ticks stay on this page only; nothing is saved or sent.
Hypothetical details on this page
These details were invented to make the example concrete. They do not describe a real client, result or measurement.
- The organization is a fictional independent school with about 60 staff.
- Two on-premises servers: shared files and an older administration application.
- Changes happen outside term-time teaching hours.
- Helpdesk support during the change is offered as part of scope.
- Old servers stay read-only until the school agrees to retire them.